🚚 Free Worldwide Shipping on All Orders!Shop Now
Adirondack Glider Chair Wood Project Plan
HomeStore

Adirondack Glider Chair Wood Project Plan

Adirondack Glider Chair Wood Project Plan

This classic outdoor design has a contoured seat and back, plus relaxing glider motion, for the ultimate in seating comfort.
(Dimensions: 28" Wide X 39" Tall)

There are two options for your convenience; #YF18KIT is our Hardware Kit with the bolts, nuts, washers, and wood screws or you may wish to order #YF18KIT2 which is the Hardware Kit as well as 4 of our Glider Hangers.

More Info
Dimensions: 28" wide x 39" tall

Wood:
Select #1 grade redwood or cedar (knot-free):
Five 1x6 x 6' long boards
One 1x8 x 6' long board
Two 2x6 x 6' long boards
One 2x8 x 6' long board
One 1x2 x 6' long board

(If you don't mind the look of knots in your project, use a lower cost #2 grade of lumber.)

Saw:
Table saw or circular saw, band saw, hand-held sabre saw

Parts Offered:
#PLG375 (3/8" dia wooden plugs)
#YF18KIT2 (4 glider hangers and one hardware kit)

Or you may order these items separately: #yfhgr (4 glider hangers) and #YF18KIT (Glider Hardware Kit)

Sealer: High-grade, non-yellowing, semi-gloss, uv protected project sealer (#polyqt) for exterior use.

$5.41

Original: $15.45

-65%
Adirondack Glider Chair Wood Project Plan

$15.45

$5.41

Adirondack Glider Chair Wood Project Plan

This classic outdoor design has a contoured seat and back, plus relaxing glider motion, for the ultimate in seating comfort.
(Dimensions: 28" Wide X 39" Tall)

There are two options for your convenience; #YF18KIT is our Hardware Kit with the bolts, nuts, washers, and wood screws or you may wish to order #YF18KIT2 which is the Hardware Kit as well as 4 of our Glider Hangers.

More Info
Dimensions: 28" wide x 39" tall

Wood:
Select #1 grade redwood or cedar (knot-free):
Five 1x6 x 6' long boards
One 1x8 x 6' long board
Two 2x6 x 6' long boards
One 2x8 x 6' long board
One 1x2 x 6' long board

(If you don't mind the look of knots in your project, use a lower cost #2 grade of lumber.)

Saw:
Table saw or circular saw, band saw, hand-held sabre saw

Parts Offered:
#PLG375 (3/8" dia wooden plugs)
#YF18KIT2 (4 glider hangers and one hardware kit)

Or you may order these items separately: #yfhgr (4 glider hangers) and #YF18KIT (Glider Hardware Kit)

Sealer: High-grade, non-yellowing, semi-gloss, uv protected project sealer (#polyqt) for exterior use.

Product Information

Shipping & Returns

Description

This classic outdoor design has a contoured seat and back, plus relaxing glider motion, for the ultimate in seating comfort.
(Dimensions: 28" Wide X 39" Tall)

There are two options for your convenience; #YF18KIT is our Hardware Kit with the bolts, nuts, washers, and wood screws or you may wish to order #YF18KIT2 which is the Hardware Kit as well as 4 of our Glider Hangers.

More Info
Dimensions: 28" wide x 39" tall

Wood:
Select #1 grade redwood or cedar (knot-free):
Five 1x6 x 6' long boards
One 1x8 x 6' long board
Two 2x6 x 6' long boards
One 2x8 x 6' long board
One 1x2 x 6' long board

(If you don't mind the look of knots in your project, use a lower cost #2 grade of lumber.)

Saw:
Table saw or circular saw, band saw, hand-held sabre saw

Parts Offered:
#PLG375 (3/8" dia wooden plugs)
#YF18KIT2 (4 glider hangers and one hardware kit)

Or you may order these items separately: #yfhgr (4 glider hangers) and #YF18KIT (Glider Hardware Kit)

Sealer: High-grade, non-yellowing, semi-gloss, uv protected project sealer (#polyqt) for exterior use.

Adirondack Glider Chair Wood Project Plan | The Winfield Collection