🚚 Free Worldwide Shipping on All Orders!Shop Now
Garden Wishing Well Wood Project Plan
HomeStore

Garden Wishing Well Wood Project Plan

Garden Wishing Well Wood Project Plan

Accent your garden or flower bed with this small version of our popular wishing well. Pattern includes complete instructions from start to finish. (approx 24" tall x 12" in diameter)
More Info
Description:
ACCENT YOUR GARDEN OR A FLOWER BED WITH THIS SMALL VERSION OF OUR POPULAR WISHING WELL.

Dimensions:
24" TALL X APPROX. 12" IN DIA. (AT BASE)

Wood:
7/8" THICK ROUGH-SAWN CEDAR (11-1/4" X 96" LONG BOARD)
1/2" dia. x 10-1/2" LONG Wood Dowel
One 1/4" dia. x 2-1/2" LONG Wood Dowel

Saw:
TABLE SAW OR HAND-HELD SABRE SAW

Paints:
2083 FIRE RED (FOR HEARTS)
$10.45
Garden Wishing Well Wood Project Plan
$10.45

Garden Wishing Well Wood Project Plan

Accent your garden or flower bed with this small version of our popular wishing well. Pattern includes complete instructions from start to finish. (approx 24" tall x 12" in diameter)
More Info
Description:
ACCENT YOUR GARDEN OR A FLOWER BED WITH THIS SMALL VERSION OF OUR POPULAR WISHING WELL.

Dimensions:
24" TALL X APPROX. 12" IN DIA. (AT BASE)

Wood:
7/8" THICK ROUGH-SAWN CEDAR (11-1/4" X 96" LONG BOARD)
1/2" dia. x 10-1/2" LONG Wood Dowel
One 1/4" dia. x 2-1/2" LONG Wood Dowel

Saw:
TABLE SAW OR HAND-HELD SABRE SAW

Paints:
2083 FIRE RED (FOR HEARTS)

Product Information

Shipping & Returns

Description

Accent your garden or flower bed with this small version of our popular wishing well. Pattern includes complete instructions from start to finish. (approx 24" tall x 12" in diameter)
More Info
Description:
ACCENT YOUR GARDEN OR A FLOWER BED WITH THIS SMALL VERSION OF OUR POPULAR WISHING WELL.

Dimensions:
24" TALL X APPROX. 12" IN DIA. (AT BASE)

Wood:
7/8" THICK ROUGH-SAWN CEDAR (11-1/4" X 96" LONG BOARD)
1/2" dia. x 10-1/2" LONG Wood Dowel
One 1/4" dia. x 2-1/2" LONG Wood Dowel

Saw:
TABLE SAW OR HAND-HELD SABRE SAW

Paints:
2083 FIRE RED (FOR HEARTS)
Garden Wishing Well Wood Project Plan | The Winfield Collection