
Semi & Trailer Wood Project Plan(F)
Make the Cab from glued up layers of wood and the Trailer from 3/4" thick boards. Trailer has doors that open to a spacious cargo hauling area then lock during transit. Cab and Trailer use the parts listed under More Info. Complete instructions are included on our full-size pattern. (Measures over 24 inches long)
More Info
DIMENSIONS:9 3/4" H X 24 3/4" L
WOOD:
3/4" (STANDARD 1" PINE)
3/8" (RIPPED PINE)
SAW:
SCROLL SAW OR BAND SAW
WINFIELD PARTS:
(14) WHL25 (2) AXLE2
OTHER PARTS:
DOWELS: 3/8", 1/4" DIA
NOTES:
THE AXLES FOR THE TRAILER ARE MADE OUT OF DOWELS
PAINTS:
STAIN OR PAINT THE COLOR OF YOUR CHOICE
Original: $7.45
-65%$7.45
$2.61Semi & Trailer Wood Project Plan(F)
Make the Cab from glued up layers of wood and the Trailer from 3/4" thick boards. Trailer has doors that open to a spacious cargo hauling area then lock during transit. Cab and Trailer use the parts listed under More Info. Complete instructions are included on our full-size pattern. (Measures over 24 inches long)
More Info
DIMENSIONS:9 3/4" H X 24 3/4" L
WOOD:
3/4" (STANDARD 1" PINE)
3/8" (RIPPED PINE)
SAW:
SCROLL SAW OR BAND SAW
WINFIELD PARTS:
(14) WHL25 (2) AXLE2
OTHER PARTS:
DOWELS: 3/8", 1/4" DIA
NOTES:
THE AXLES FOR THE TRAILER ARE MADE OUT OF DOWELS
PAINTS:
STAIN OR PAINT THE COLOR OF YOUR CHOICE
Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Make the Cab from glued up layers of wood and the Trailer from 3/4" thick boards. Trailer has doors that open to a spacious cargo hauling area then lock during transit. Cab and Trailer use the parts listed under More Info. Complete instructions are included on our full-size pattern. (Measures over 24 inches long)
More Info
DIMENSIONS:9 3/4" H X 24 3/4" L
WOOD:
3/4" (STANDARD 1" PINE)
3/8" (RIPPED PINE)
SAW:
SCROLL SAW OR BAND SAW
WINFIELD PARTS:
(14) WHL25 (2) AXLE2
OTHER PARTS:
DOWELS: 3/8", 1/4" DIA
NOTES:
THE AXLES FOR THE TRAILER ARE MADE OUT OF DOWELS
PAINTS:
STAIN OR PAINT THE COLOR OF YOUR CHOICE












